Remove 2011 Remove 2012 Remove 2016 Remove Article
article thumbnail

What should the program for a Transportation Management District look like?

Rebuilding Place in Urban Space

The Tribune article asks the question of whether or not the streetcar is contributing to traffic reduction. The journal article " Making Cycling Irresistible ," inspired my own blog entry in 2008, " Ideas for Making Cycling Irresistible in DC." I'd say definitely not, the ridership is abysmal.

article thumbnail

Metrorail Silver Line phase two opening this week

Rebuilding Place in Urban Space

But the failures in planning extend beyond DC (" Silver Line Metro expansion a classic example of the need to have true regional transportation planning ," 2011). DC does not understand its "unique selling proposition" or "core competency" is being transit- and sustainable mobility-centric. Proposed Gatineau-Ottawa transit loop.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Florida's Brightline passenger rail as an opportunity to rearticulate and extend transit service in cities like Orlando

Rebuilding Place in Urban Space

They started planning in 2012, construction in 2014, and opened the first stations in South Florida in 2018. To ride is expensive compared to the regional commuter rail in South Florida and Brightline has had serious problems with crashes with vehicles and pedestrians. Lots of deaths. But it's quite impressive in two ways.

article thumbnail

Revisiting the 11th Street Bridge Park project as an opportunity rather than a folly: a new revitalization agenda for East of the River, DC

Rebuilding Place in Urban Space

From the article: Surveying the 30-plus public gardens, arboretums, historical landscapes, and support groups that comprise Greater Philadelphia Gardens, consulting firm Econsult Solutions added up the digits and found an economic impact of $256 million a year, a big boon for the tourism industry.

article thumbnail

Current GSE Guarantee Fees Are Too Low to Be Consistent with Regulatory Capital: Does This Mean a Large Increase Is Coming?

The Stoop (NYU Furman Center)

trillion in 2016, which at the time was almost twice the size of the Federal Reserve’s balance sheet and became the largest source of GSE profits. During much of conservatorship (specifically 2012 to 2019), strangely, capital was depleted by design. The two portfolios together peaked at over $1.5 Also, the 0.10

2008 52