Managing Emergencies: The Challenges of the Future

Disaster Planning and Emergency Management

In some instances, notably the Manchester Arena bombing and the Grenfell Tower fire (both in 2017), the shortcomings have been nothing less than scandalous (Kerslake 2018, Moore-Bick 2019). The same is true of some of the earlier events, such as the Hillsborough stadium disaster of 1989. Was this not a disaster?

article thumbnail

Towards a Taxonomy of Disasters

Disaster Planning and Emergency Management

Tierney (2008) provided a functional semantic classification of the size of extreme events (revised by Alexander 2016, p. ) I suggest the following five:- (a) Natural disasters, caused by extreme natural events. Field 2018). and this might give us some basis for distinguishing phenomena by the magnitude of their impacts.

2010 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Hospitals as urban anchors/revitalization levers, not usually, but with great potential to serve communities in important ways: Examples are two forthcoming projects by Intermountain Health and University of Utah Health

Rebuilding Place in Urban Space

. -- " Ordinary versus Extraordinary Planning around the rebuilding of the United Medical Center in Southeast Washington DC | Part One: Rearticulating the system of health and wellness care East of the River ," 2018 -- " Part Two: Creating a graduate health and biotechnology research initiative on the St. CVS Health Hub concept.

article thumbnail

Updating the best practice elements of revitalization to include elements 7 and 8 | Transformational Projects Action Planning at a large scale

Rebuilding Place in Urban Space

I will say that adaptive management is a lot like my old "Action Planning" approach, which uses the design method, and dates back to 2008 and observation of best practice then. Transformational Projects Action Planning. Action Planning is a framework with five inter-connected components: 1. Design Method rather than Rational Planning 2.

article thumbnail

Current GSE Guarantee Fees Are Too Low to Be Consistent with Regulatory Capital: Does This Mean a Large Increase Is Coming?

The Stoop (NYU Furman Center)

In the years immediately following conservatorship (which began in September 2008), the FHFA increasingly took over setting the average G-fee. 7 Both the capital requirement and the needed level of market return were determined by the FHFA, then under the directorship of Mel Watt 8 (2014 to very early 2019).

2008 52
article thumbnail

Haiti: has there been progress in disaster reduction since the last big earthquake?

Disaster Planning and Emergency Management

Four such events have occurred since the country attained independence from France in 1804. For example, in the 2008 hurricane season, four named storms arrived. NACLA Report on the Americas 43(4): 32-36, doi: 10.1080/10714839.2010.11725505 [vii] Sarmiento, Juan Pablo, Suzanne Polak and Vicente Sandoval 2019.