article thumbnail

To and from origin stations can be difficult: More on the Silver Line and intra-neighborhood transit (tertiary network)

Rebuilding Place in Urban Space

The transit network concept I worked out is based on how Arlington County, Virginia, in their 2005 Trasnportation Plan, defined a Primary and a Secondary Transit Network. The solution is shuttle/jitney service to and from stations, rather than building more parking. Tertiary Network concept. I extended the concept to multiple scales.

article thumbnail

WMATA is pathetic: of course it belongs to "the public"

Rebuilding Place in Urban Space

For frequent, new and visiting customers, we are piloting new signage, beginning with putting service information at street level at Metro Center. In the near term, we are supporting returning customers with more rapid social media engagement, and extended customer service hours Monday through Friday 7 a.m. and Saturday and Sunday 8 a.m.

2009 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Towards a Taxonomy of Disasters

Disaster Planning and Emergency Management

Tierney (2008) provided a functional semantic classification of the size of extreme events (revised by Alexander 2016, p. ) Associating particular kinds of disaster with classes of event obviates the need to restate basic information every time we deal with such phenomena. Caffrey 2005. Earthquake Spectra 21(3): 779-802.

2010 52
article thumbnail

Eastern Market DC's 150th anniversary last weekend | And my never realized master plan for the market

Rebuilding Place in Urban Space

In 2005, I served on the advisory committee for the International Public Markets Conference which covered both DC and Baltimore that year, led a tour, etc. I first proposed to the city creating TMDs in 2005/2006. It could be on screens, as an app, as part of an integrated kiosk-information network. They still haven't.

article thumbnail

Metrorail Silver Line phase two opening this week

Rebuilding Place in Urban Space

Sixth, and belatedly, that the Silver Line taxed the system's infrastructure in ways that have made degradation of service quality standard practice (" More on Redundancy, engineered resilience, and subway systems: Metrorail failures will increase without adding capacity in the core, " 2016). Extending the Yellow Line south on Rte.

article thumbnail

The GSE Public-Private Hybrid Model Flunks Again: This Time It’s the Federal Home Loan Bank System (Part 1)

The Stoop (NYU Furman Center)

Part 1 covers some general background information on GSEs as well as the extremely relevant precedent set by the reforms imposed by the FHFA upon F&F in reaction to the most well-known case where the public-private hybrid GSE design had quite visibly flunked. As an example of their lobbying power, in 2004 and 2005 the George W.

2008 88
article thumbnail

Current GSE Guarantee Fees Are Too Low to Be Consistent with Regulatory Capital: Does This Mean a Large Increase Is Coming?

The Stoop (NYU Furman Center)

trillion in 2016, which at the time was almost twice the size of the Federal Reserve’s balance sheet and became the largest source of GSE profits. Bush, when the administration and the Federal Reserve proposed to limit the size of the investment portfolios of the two companies in 2005. See [link]. 22] See the G-fee Report, pp.

2008 52