Remove 2005 Remove 2014 Remove 2022 Remove Management
article thumbnail

The Road Not Taken | a response to a letter to the editor in the Washington Post about DC, traffic deaths and traffic safety

Rebuilding Place in Urban Space

Inadequacies in school transportation planning ," 2022 -- School Walk and Bike Routes: A Guide for Planning and Improving Walk and Bike to School Options for Students -- Safe Routes to School program , Washington State -- City of Tacoma SRTS program , including SRTS Action Plan -- Starkville in Motion A failed job interview with DDOT.

article thumbnail

It’s time to talk about a regional tax to help fund Metro (DC area)

Rebuilding Place in Urban Space

DC doesn't have the budget to be able to take on the full responsibility of WMATA, but that would allow it to manage it in a way that benefits the city. In 2009 and a couple times afterwards, I said it was necessary for WMATA to rebuild the regional/metropolitan consensus about support for transit.

2006 52
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

WMATA is pathetic: of course it belongs to "the public"

Rebuilding Place in Urban Space

Though I am privileged to be the general manager, it’s your Metro, so please let us know how we can serve you better. I am empowering all staff members to own our service outcomes and to proudly represent America’s transit system. As you travel the region this fall, I hope you will choose Metro.

2009 52
article thumbnail

Current GSE Guarantee Fees Are Too Low to Be Consistent with Regulatory Capital: Does This Mean a Large Increase Is Coming?

The Stoop (NYU Furman Center)

percent) in 2014, after having been purposefully increased by the FHFA and the two GSEs in prior years. percent range since 2014, rather than being materially lower or higher, does not seem to be well understood in the industry or among policy specialists. percent to 0.49 percent to 0.49

2008 52
article thumbnail

Metrorail Silver Line phase two opening this week

Rebuilding Place in Urban Space

First, Virginia's focus on privatization, which is why the Silver Line was not built by Metro (" Silver Line delays: maybe the real lesson is that contracting out construction to the private sector doesn't always work so well ," 2014). This should have been done as part of BRAC planning, something I first suggested in 2005.)

article thumbnail

Government Mortgage Interest Rates: A Serious Discussion about the Intertwined Topics of Risk Adjustment and Cross-subsidies

The Stoop (NYU Furman Center)

This was described on the one hand as unfair, since it relied on overcharging low-risk borrowers “who had played by all the rules” and, on the other hand, as unduly incenting bad loans at the GSEs (by charging too little for high-risk loans) in a quasi-replay of the lead up to the mortgage bubble of 2005 to 2008. ” [link].