Remove 2003 Remove 2006 Remove 2014 Remove Operations
article thumbnail

Revisiting the 11th Street Bridge Park project as an opportunity rather than a folly: a new revitalization agenda for East of the River, DC

Rebuilding Place in Urban Space

The Economic Impact of Local Parks: An Examination of the Economic Impacts of Operations and Capital Spending on the United States Economy , National Recreation and Parks Association). But even before that I went back and forth on it. And if there is a lot of kid visitation, well kids don't spend money. I can't think of a worse walk.

article thumbnail

Metrorail Silver Line phase two opening this week

Rebuilding Place in Urban Space

First, Virginia's focus on privatization, which is why the Silver Line was not built by Metro (" Silver Line delays: maybe the real lesson is that contracting out construction to the private sector doesn't always work so well ," 2014). Washington Post , July 13, 2003. You don't complain about system problems when it opens, but before.

article thumbnail

Updating the best practice elements of revitalization to include elements 7 and 8 | Transformational Projects Action Planning at a large scale

Rebuilding Place in Urban Space

Around 2006 it "repaired" Thomas Circle, which decades before had been cut through with more road travel lanes. Another DC example is development on the site of the Takoma Metrorail station (" The Takoma Metro Development Proposal and its illustration of gaps in planning and participation processes ," 2014).