Remove 2003 Remove 2006 Remove 2014 Remove Housing
article thumbnail

Revisiting the 11th Street Bridge Park project as an opportunity rather than a folly: a new revitalization agenda for East of the River, DC

Rebuilding Place in Urban Space

The third is preserving housing. But even before that I went back and forth on it. I talked about this during the design process, and now that I am on the board of a park, I am proved right. There just aren't that many jobs. And my park is 110.5 Should have been addressed for decades.

article thumbnail

Updating the best practice elements of revitalization to include elements 7 and 8 | Transformational Projects Action Planning at a large scale

Rebuilding Place in Urban Space

1) neighborhood/district/city/county wide as part of a master plan; (2) within functional elements of a master plan such as transportation, housing, or economic development; and (3) within a specific project (e.g., Around 2006 it "repaired" Thomas Circle, which decades before had been cut through with more road travel lanes.