Remove 2005 Remove 2014 Remove 2016 Remove Events
article thumbnail

Metrorail Silver Line phase two opening this week

Rebuilding Place in Urban Space

First, Virginia's focus on privatization, which is why the Silver Line was not built by Metro (" Silver Line delays: maybe the real lesson is that contracting out construction to the private sector doesn't always work so well ," 2014). This should have been done as part of BRAC planning, something I first suggested in 2005.)

article thumbnail

Community building versus economic development

Rebuilding Place in Urban Space

Personally, I think an arena is probably an acceptable choice, especially as it likely will increase transit ridership to events--the team estimates that the 70% of trips to the current arena will drop to 40%, with the much better transit location of Market East. and Baltimore metropolitan areas ," Transport Policy , 2014.

article thumbnail

Current GSE Guarantee Fees Are Too Low to Be Consistent with Regulatory Capital: Does This Mean a Large Increase Is Coming?

The Stoop (NYU Furman Center)

percent) in 2014, after having been purposefully increased by the FHFA and the two GSEs in prior years. percent range since 2014, rather than being materially lower or higher, does not seem to be well understood in the industry or among policy specialists. percent to 0.49 percent to 0.49 The two portfolios together peaked at over $1.5

2008 52